网站地图
加入收藏
 
Corrent Localtion: Homepage  -  News Center   
 
Abrator Series Notice for Operation
Time:2015-07-27
Operators should assure whether meters and instrument are under normal condition. 1. All employees that enter into the shot blasting room should wear goggles and safety helmet. 2. Operators should check the equipment everyday. Including lubricated part and machinery part Lubricated part: speed reducer, hydraulic pressure, atomized lubricator and bearing chain Machinery part: wearable state of wearable parts, wearable parts that are easy to be damaged Register wearable parts everyday and exchange timely 3. Oil should be timely added for lubricated parts 4. Directional jacket should be timely adjusted and exchanged 5. Check whether the steel sheet piling volume is enough or not everyday
 
All contents (c) Copyright 2007 青岛黄河机械有限公司 reserved. 鲁ICP备05033022号
For help with your payment, contact / info@huanghejixie.com / 0532-87521999